ADSS order control

ADSS Inspection and Export Release Record

A verifiable workflow linking route inputs, approved cable construction, optical checks, drum labels and loading evidence.

OTDR testing for ADSS order

01 · Control steps

01

Lock the route inputs

Confirm span schedule, wind, temperature, fibre count, installation method and project specification.

02

Approve cable and fittings

Align construction, diameter, marking, drum length and compatible suspension or dead-end sets.

03

Release with evidence

Check batch reference, agreed optical tests, labels, packing and loading photographs.

02 · Evidence available for review

ADSS production workshop
Production

Construction and marking checked against the approved requirement.

ADSS optical inspection
Testing

OTDR or attenuation evidence prepared when agreed for the order.

Fiber cable export loading
Export release

Drum numbers, packing list and visual loading evidence cross-checked.

Review a similar ADSS order

Send the span schedule, route drawing, fibre count, wind data and destination.

Discuss the route