Fiber Optic Cable Factory for African Projects WhatsApp: +86 189 2813 3387
Panoramic view of the Guangzhou Jiaxin Communication Optical Cable factory entrance

Africa Project Supply

Jiaxin Factory Evidence for African Fibre Routes

Review cable construction, optical inspection, drum planning and export preparation against the actual African route and destination.

Jiaxin office entrance

Company Information

Factory Identity and Project-specific Release

Company: Guangzhou Jiaxin Communication Optical Cable Co., Ltd.

Factory address: First Floor, Factory Building, Zhugukeng, Shixia Village, Xintang Town, Zengcheng District, Guangzhou, Guangdong, China.

Factory area: 16,600 m². For African orders, the technical file records country, aerial or buried route, spans or pulling sections, fibre count, drum schedule, destination and buyer inspection requirements.

Project Delivery Heritage

Large-project experience since 2010

Major projects require technical confirmation, schedule control and documented handover—not only cable production.

Historical participation is stated from factory project records. Supporting documents may be reviewed where available and permitted.
2010

Guangzhou Asian Games project experience

According to factory project records, the factory participated in communications-cable related delivery supporting preparations for the 2010 Guangzhou Asian Games. Its assigned scope was completed on schedule and received positive project feedback.

Since 2010

Continued engineering delivery

Experience has continued across telecom backbone, FTTH access, power-corridor and protected industrial routes, including demanding African installation conditions.

Today

Traceable project handover

Approved construction, optical records, numbered drums, packing evidence and destination documents support buyer review.

Route-based Production

Four Controls for African Project Orders

The same model name is not enough: climate, spans, soil, handling and port delivery change the required construction and evidence.

01

Route and climate

Confirm spans, wind, UV, soil, flooding, rodent exposure and building-entry conditions.

02

Cable construction

Approve fibre, tube layout, strength member, water blocking, armour, sheath and marking.

03

Drum and field plan

Match drum sections, closures, fittings, unloading limits and remote-site installation sequence.

04

Release evidence

Reconcile optical results, drum identity, labels, packing list, wood treatment and loading photos.

Factory Videos

Production, OTDR and Export Packing Evidence

Use the videos as supplier-verification evidence, then request records carrying the batch or drum references for the actual order.

Alibaba.com

Alibaba.com Filmed Production and Quality Control

Production

ADSS Optical Cable Manufacturing

Quality Control

OTDR Testing and Inspection

WhatsAppEmail