Fiber Optic Cable Factory for African ProjectsWhatsApp: +86 189 2813 3387

West Africa · Rural FTTH

West Africa Rural FTTH Procurement Plan

A rural FTTH quotation becomes useful when feeder, distribution, last-mile materials and delivery lots follow the actual network sections—not a single undivided product list.

West Africa Rural FTTH Procurement Plan

01 · Three decisions to settle first

01

Coverage before quantities

Map villages, handholes, pole groups and subscriber clusters before calculating cable and box quantities.

02

Split ratio before box capacity

Confirm the optical budget and splitter stages before selecting distribution boxes by port count.

03

Delivery lots before packing

Group drums, coils and accessories by construction phase so remote crews can identify the correct materials.

02 · Recommended project structure

Network sectionTypical product familyWhat to confirm
Feeder and distributionGYTA/GYTS duct cable or ADSSRoute method, fibre count, splice points and drum schedule
Distribution pointsPLC splitters, closures and FTTH boxesSplit ratio, connector type, capacity and environmental sealing
Subscriber connectionGJYXCH drop cable and fittingsOutdoor span, building entry, coil length and termination method

03 · Information to send with the RFQ

  • Feeder and distribution: Route method, fibre count, splice points and drum schedule
  • Distribution points: Split ratio, connector type, capacity and environmental sealing
  • Subscriber connection: Outdoor span, building entry, coil length and termination method
  • Coverage before quantities: Map villages, handholes, pole groups and subscriber clusters before calculating cable and box quantities.
  • Split ratio before box capacity: Confirm the optical budget and splitter stages before selecting distribution boxes by port count.

04 · Factory evidence buyers can request

The quotation should connect the proposed construction to production, optical testing and shipment records. Ask for evidence for the offered model and order—not generic marketing files.

Production — Jiaxin Fiber
Production

Cable construction and jacket marking confirmed before the run

Quality control — Jiaxin Fiber
Quality control

OTDR attenuation and length checks recorded before packing

Export handover — Jiaxin Fiber
Export handover

Labels, quantities and packing checked before loading

05 · Related technical pages

06 · Route-specific buyer questions

What should be confirmed for Feeder and distribution?

Route method, fibre count, splice points and drum schedule. GYTA/GYTS duct cable or ADSS.

What should be confirmed for Distribution points?

Split ratio, connector type, capacity and environmental sealing. PLC splitters, closures and FTTH boxes.

What should be confirmed for Subscriber connection?

Outdoor span, building entry, coil length and termination method. GJYXCH drop cable and fittings.

Quotation inputs for West Africa · Rural FTTH

Send the route sketch, planned homes, split ratio and delivery location. We can turn them into a separated cable and accessory schedule.

Send project requirements
WhatsAppEmail